MSNBC Space News
Tue, 19 Aug 2008 20:54:58 GMT

A video view from the Iranian TV station Al-Alam shows Saturday's launch of the Safir rocket. Initially, Iranian media said that the rocket put the nation's first home-produced communications satellite into orbit, but later reports maintained that the mission was merely a test of the launch vehicle.Iranian officials say a rocket launch last weekend was merely a test, but U.S. military intelligence officials now see it as a failed attempt to put a satellite in orbit.


Tue, 19 Aug 2008 22:39:56 GMT

An artist's interpretation shows NASA's Ares 1 rocket launching spaceward. A dual shock absorber system for the rocket should solve the problem of excessive vibration during flight, the agency says.NASA engineers have come up with a dual shock absorber solution to the problem of excessive vibrations with the new Ares 1 rocket that will launch the agency's Orion space shuttle replacement.


Tue, 19 Aug 2008 20:01:32 GMT

Comparison of a typical micro-spacecraft to the size of a birthday cake. To bring this sci-fi vision of 50-pound "micro-spacecraft" and 10-pound "nano-spacecraft" to reality, scientists have now invented a razor-thin skin that can protect craft against the extreme heat and intense cold found in outer space and withstand micrometeoroids hurtling at thousands of miles per hour.


Mon, 18 Aug 2008 20:49:34 GMT

The innermost part of the earth. The outer core extends from 2500 to 3500 miles below the earth's surface and is liquid metal. The inner core is the central 500 miles and is solid metal.Something beneath the surface is changing Earth's protective magnetic field, which may leave satellites and other space assets vulnerable to high-energy radiation.


Mon, 18 Aug 2008 20:55:26 GMT

This artist's rendering shows the Lunar Reconnaissance Orbiter going around the moon with Earth in the background. The unmanned spacecraft was supposed to launch in early December, but has been delayed until 2009.NASA has delayed the launch of an unmanned spacecraft to the moon to scout for potential landing sites for astronauts.


More space news...
6314 cvs - 592 jobs

CANDIDATES

  • HOME
  • POST YOUR CV
  • JOB SEARCH
  • RECRUITERS

  • HOME
  • REGISTER
  • CV SEARCH
  • POST JOBS
  • Quick CV Search

    CV: RF & Mechanical Designer

    Printer Friendly


    << BACK

    Personal information
     Name:<withheld>
     Age:<withheld>
     Country:<withheld>
     Location:<withheld>
    Contact information
     Email:<withheld>
     Phone:<withheld>
     Mobile:<withheld>
    Candidate Profile
     Date Submitted:24-06-2008
     Last Modified:24-06-2008 (03:06)
    Job information
     Current job:RF & Mechanical Designer
     Employment Term:Permanent
     Relocation:Europe only
     Date available:within 3months
     Industry:Satellite Operators
     KeywordsTest for Electrical Systems. • Test with Eutelsat and Intelsat procedure for satellite station acceptance (with test and electrical measure for parabolic antenna –with different parameters).. • Antenna electrical measure with Spectrum Analyzer by
    CV
    PERSONAL INFORMATION
    Nationality Italian
    City and born date Catania 19/07/1975
    WORK EXPERIENCE
    • Date from14/11/1996 today
    • Name and address of last work company
    Antech S.p.A. Via Vittorio Emanuele Orlando, 7 95037 San Giovanni La Punta
    • Type of work company Telecommunication. Design and production of Satellite Up/Down Link
    • My job skills Design and Documentation chief
    • My main job • Link budget and satellite station design (Up/down Link) with parabolic antenna;
    • Structural and thermal simulation for mechanical parts of antenna handling and support (for several ambient condition): with software for 3D solid modelling and finite beam simulation (I-deas della SDRC)
    • Supervisor in the station installation site (TX/RX Down and UP Link) with different configuration ; maintenance chief and TX and RX devices repair office.
    • Design of the follow microwave (in wave guide) components: feed, sub-reflector, Amplifier and frequency converter.
    • Wave-guide branching Design with standard components: Ku Band (WR75)- K band-(WR62)- Ka band (WR42/28)- C band (WR137/229) con High Power Amplifier with configuration until 5+1
    • Assembly and Design for transmission system for radar application 90Ghz (WR10).
    • Electronics circuits Design for amplifier and frequency converters (with Microwave-Office software and/or Design of Ansolft software ).
    • Electronics devices test for amplifier and frequency converters in Ku Band and Ka Band.
    • Realization of installation procedure , test and devices acceptance (mechanical and RF), safety procedure for site installation, devices user and maintenance manuals (both English and Italian languages);
    • Chief of Company’s products archive.
    CAPACITY RELATIONAL
    COMPETENCE
    • Maintenance and installation in the installation site in the follow European and Non-European states (Spain, Portugal, Ukraine, Germany, Croatia, Serbia, Egypt , France, Scotland , Sweden).
    • Relation with the costumer to plan and delivery the work ;
    CAPACITY AND RELATION
    COMPETENCE
    • Test for Electrical Systems.
    • Test with Eutelsat and Intelsat procedure for satellite station acceptance (with tst and electrical measure for parabolic antenna –with different parameters)..
    • Antenna electrical measure with Spectrum Analyzer by HP or by Agilent, and microwave components (filters, coupler, etc…) with Vector Analyzer.
    • Realization of electrical scheme related at the electronic devices.
    • Mechanical Design for wave-guide components (as filter, horn, diplexer, etc…);
    • Excellent know-how about the follow applications:
    1. Word (Excellent)
    2. Excel (Excellent)
    3. Corel Draw (Excellent)
    4. AutoCAD 2004 (Excellent)
    5. I-deas (SDRC) (Excellent): 3D solid modelling, bi-dimensional drawing and thermal /structural analysis with beam elements
    6. MathCAD (Good)
    7. Microwave-Office (Good): design and simulation for electrical circuits
    8. Design by Ansolft (Good): design and simulation for electrical circuits
    9. Grasph (Good): antenna’s design
    • Software for programs develop:
    1. Assembler (Good)
    2. C++ (Good)
    INSTALLATION AND PROJECT • January 1998 in the Telespazio station– Fucino, Avezzano, Italy
    Design and installation of Up-link station with 7m antenna Ku Band and 4 ports Feed (linear polarization) (10.7-14.5 GHz).
    • June 1998 in the Hughes Olivetti –Germany
    Design and installation of Up-link station with 7m antenna Ku Band and 4 ports Feed (linear polarization) (10.7-14.5 GHz), with branching systems assembly with 3+1 1500W Klystron CPI Amplifier.
    • Marc 1999-Settembre 1999 in the Ukrocosmos Kiev / Telecommunication Minister – Ukraine
    Design and installation of Up-link station with 7m antenna Ku Band and 4 ports Feed (linear polarization) (10.7-14.5 GHz), with branching systems assembly with 3+1 600W TWT CPI Amplifier
    • January 2001in the Telecom Serbia, Javiniza, Serbia
    Design of structural support interface for 18m reflector, ad design of and RF design of 4 ports Feed in C Band (circular polarization).
    • April 2003 pfor Alcatel company
    o Design and installation of Up-link station with 3.7m antenna Ku Band and 2 ports Feed (linear polarization) (10.7-14.5 GHz),; Thermal and structural analysis for extreme ambient condition in the Afghanistan s installation site.
    • June 2004 – in the Euphon Sky-Logic -Turin, Italy
    Design and installation of Up-link station with 7m antenna Ku Band and 2 ports Feed (linear polarization) Ka Band ( 20.5-30.0 GHz) for south Africa communication.
    • January 2004 to May 2004
    o Design and develop of the conversion frequency system L-Ka Band and the amplifier ka band 36dBm: this system have been designed in the stand alone case. Also in the project have been designed the 96cm primus focus offset antenna and the mechanical support and handling system. The assembly system have been to work with the new satellite Hot Bird 6.
    • July 2005 in the ESA (European Space Agency)–Frascati, Italy
    Design and installation of the Up-Link station with double reflector antenna (3.7m diameter) and 4 ports ka band Feed (20.2-29.5 GHz).
    • June 2006 to January 2007
    o Mechanical and Electrical design for the Up-Link System with double reflector offset 1.5m antenna. This system have been provided for the Italian defence Minister (Italian Firemen); The system have been included the user and maintenance manuals and the electrical system design.
    • October 2006 to January 2007 for Telespazio-Rome
    o Mechanical and Electrical design for the Up-Link System with double reflector offset 1.5m antenna: this system have been included the Soft fail system for the 2 CPI 400W Outdoor amplifier and Wr75 Branching system.
    • June 2007 to July 2007 for Telespazio Sky-Village Milan-Italy
    o Design of N.3 antennas (n.2 Ku Band and N.1 in K Band) with 4 ports Feed and included the tracking sub-system, the De-icing control system and Deicing plenum,
    • Personal referent for Up_link Stations for the ESA –Kiruna , Sweden-and frascati- Rome.
    EDUCATION
    Diploma Industrial Technical in Electronic, Telecommunication and Automatic systems
    Institute “I.T.I.S.” Archimede in Catania-Italy
    Date 1993/94
    Mark: 56/60
    Degree: Degree in Telecommunications Engineering
    “GSM Network, Wireless, antennas and optical Fiber transmission “
    Institute Politecnico in Turin
    Date 2007
    Thesis “Design for Up Link in Ka Band and Down Link in Ku Band station”
    Thesis short description
    The preliminary design have been iin a transmission system for satellite transmission for the new Hot Bird satellite in Ka Band. This system have been constituted, also, with the 96cm primus focus offset antenna (with manual handling) and from the 2 ports Feed (linear polarization) TX in Ka Band and RX in Ku band, with the 2w amplifier and from the L-Ka band frequency converter: this system have been interfaced with the commercial modulator and with the commercial LNB. (low noise block converter Ku-L Band), with the standard interface. The mechanical system have been designed to work in the survival condition 180Km/h–40°C to +50°C;
    OTHER QUALIFICATION
    • Date November 1994 - Marc 1995
    • Type of qualification Post-diploma Courses F. S. E. effected from Antech S.p.A. in the Institute “I.T.I.S.” Archimede in Catania
    • Main subjects / professional skills
    under study
    CAD system for mechanical design (2D and 3D) on P.C. and Workstation, through the AutoCAD and Ideas software; solid modelling and simulation with beam elements. Up/Down Link station design for radio and satellite telecommunication.
    • qualification Technician specialized in telecommunication for parabolic antenna design.
    • Classification national level 46/60
    PERSONAL CAPACITY AND
    COMPETENCE
    FIRST LANGUAGE Italian
    OTHER LANGUAGE English (Cambridge PET)
    •Reading Good
    • Writing Good
    • Speaking Good
    OTHER LANGUAGE France
    •Reading Sufficient
    • Writing Scholastic
    • Speaking Scholastic
    DRIVER LICENSES A-B (for car and motorcycle vehicle)
    MILITARY SERVICE: Performed at 131 RGM ART CAM SMV CENTAURO FOGGIA from 23/03/95 to 20/06/96 with the rank of Lieutenant to complement 1 Appointment
    The undersigned is aware that Article. 26 of Law 15/68, false statements and falsehood in the
    acts and the use of false documents are punished under the Penal Code and special laws. In
    addition, the undersigned authorizing the processing of personal data, as provided by Law
    675/96 of 31 December 1996.


    Registering is the only way of posting vacancies and obtaining contact details of candidates in our CV database.
     
    All it takes is a few minutes and a credit card. To sign-up to this service, simply click on the Register link and fill in the form. You will then have instant access to our system after on-line payment where you will be able to complete the transaction in either US Dollars, UK Pounds or Euros.
     
    All online credit/debit card transitions are handled through our secure third party payment processors at WorldPay. Worldpay are part of The Royal Bank of Scotland Group, the 5th biggest banking group in the world, WorldPay payment solutions are trusted by thousands of businesses, big and small worldwide. 
     
    Pricing starts at €350 (approx £250 or US$500 - use the convert tool for an exact conversion) for one month unlimited job postings and CV database access, with package discounts available if you have more permanent recruiting needs. For example, a Gold subscription will give you unlimited jobs posting and CV database access for one year at just over €200 per month!
     
    2008 Pricing Structure (excluding VAT):
    1 month - Discovery 350 euros convert
    3 months - Bronze 850 euros convert
    6 months - Silver 1450 euros convert
    12 months - Gold 2500 euros convert
     
    If online payment is not convenient, give us a call at +33(0)562211007 or send us an email at sales@space-careers.com. We will set up an account for you and invoice you.
     
    Please note that the posting of academic or research positions is free of charge. All you need to do is email us your job description and we will post it for you.

     
    VAT:
     
    Spacelinks is based in France so the following European Union regulations regarding electronic commerce apply:
    - if your business is located outside the EU, VAT does not apply to you
    - if your business is located in France, you will be charged a 19.6% VAT
    - if your business is located in the EU and you don't have a valid VAT registration number, you will be charged a 19.6% VAT
    - if your business is located in the EU and you do have a valid VAT registration number, you won't be charged VAT provided you give us your VAT number (mandatory for invoicing)

     
    Support:
     
    For sales enquiries and general information, you can call us on +33(0)562211007.
    Support is available Mon-Fri on +33(0)562211007 or via email. Out-of-hours support is provided only via email.
    Please also note that we are located in France. Our normal office hours are 09:00 to 18:00 Monday to Friday. France timezone is GMT+1.
    Terms & ConditionsCopyright ©2008 Spacelinks - www.spacelinks.com
    Site powered by Jazar