To bring this sci-fi vision of 50-pound "micro-spacecraft" and 10-pound "nano-spacecraft" to reality, scientists have now invented a razor-thin skin that can protect craft against the extreme heat and intense cold found in outer space and withstand micrometeoroids hurtling at thousands of miles per hour.
| Quick CV Search |
|
Personal |
Date of Birth 15 January 1972 Nationality Zimbabwean Marital Status Married |
|
Summary of Qualifications 1992 - 1996 1996-1997 Feb 99 - March 99 May 2008- Nov 2008 |
National University of Science and Technology Bulawayo, Zimbabwe Bachelor of Engineering Honours Degree in Electronic Engineering -(Upper Second) Attended I.E.E accredited graduate training course at PTC Technical College (course reference number 272A98) Attended a Rural Telecommunication Engineering JICA course in Japan for six weeks. The course covered technologies applied in rural areas such as Fixed Wireless Access Network (DECT, PHS PDC), TDMA, Cellular (GSM, AMPS, PDC), Low Capacity Radio Links, Satellite and Optical Fibre. Currently being trained by ThalesAlenia Space in France to Operate and maintain a TCR Satellite Ground Control Station in Gharian Libya. |
|
PROFESSIONAL EXPERIENCE June 2008 to Present Day April 2005- May 2008 |
RascomStar-Qaf, Gharian Libya Software and Hardware maintenance Engineer for the TCR Satellite Control Center
Page Systems Technical Expert
|
|
December 2003 – April 2005 |
TELONE Pvt. Ltd. Harare, Zimbabwe Project Manager Satellite Communications
Major Projects Handled. Single Gateway Project. The project scope was to upgrade Mazowe Earth Station to enable it to handle all traffic from/to all Zimbabwe operators. Involved in Equipment specification, contract drafting, contract negotiation, and equipment ordering. |
|
January 2000- Dec 2003
|
TELONE Pvt. Ltd. Harare, Zimbabwe National Networks Dept Area Network Planner Victoria (External Plant) Main Job Tasks · Plant planning and provision of all access network i.e. point to point customer radios, wireless local loop systems, backbone transmission equipment, pair gain equipment and cables; and electrical power to meet the expectations of customers in the region. · Demand forecasts, feasibility studies and cost benefit economic analysis. · Frequency planning interference studies, microwave link design and analysis using radio planning editing software · Network provision for the area through BTO’s, tenders and other similar arrangements. · Prioritisation of projects to meet demands from Customer service managers taking into account the cost benefit position of each project implementation. · Fully responsible and accountable for installations of access network transmission equipment up to expiry of guarantee period and before hand over to relevant Customer Service Managers. · Preparing tasks and objectives to subordinate engineers and technicians. · Tender specification, documentation and evaluation; contract administration and design compliance review · Development of annual quality plans and budget for the unit, which will impact positively on revenue enhancement. · To be acquainted with the latest position with respect to customers, regulation, technology and products and services. · Cost comparison of projects using present value figures · Preparation of intensive business plans with cost benefit analysis for the Victoria region. · Quality assurance and handover certification. MAIN PROJECTS HANDLED 1. Masvingo Mars Project. This project was for the provision of Telecommunication services to about 3000 rural customers in six exchange areas using Fixed Wireless Access systems. Inputs to the Project · Involved in tender preparation i.e. technical specifications and commercial conditions. · Involved in the technical and financial evaluation of the bids · Involved in contract negotiations and drafting with the winning bidder 2.) MIMOSA VOICE AND DATA NETWORK The aim of the project is to come up with a detailed proposal for the provision of voice and data services to the Murowa Project site. Inputs to the project · Network Configuration · Network dimensioning · Detailed BOQ and estimates of costs. · Production of final document to be presented to the customer. · Coming up with an implementation time schedule. · Preparation of cost benefit analysis to assess the viability of the project · Preparation of the draft contract · Equipment ordering. · Custom clearance. |
|
June 1999 to June 2001 |
PART TIME LECTURER PTC COLLEGE Activities · Lecturing City and Guilds Part II, III & IV Radio Systems and Telecommunications Principles. |
|
June 1997 - December 2000 |
POST AND TELECOMMUNICATIONS CORPORATIONS Harare Zimbabwe. Professional Engineer –External Plant Network Activities · Preparations of specifications for Digital Multi - Access Radio Systems, Point to Point radio systems (NEC, DXR and AWA digital subscriber radio systems) and Wireless Local Loop systems · Preparation and evaluation of tenders for access network systems and cables. · Carrying out feasibility studies of radio and wireless local loop project through path profiles and site surveys before creating project files. · Planning of the installation of the systems mentioned above. · Coordinating and supervising of installation teams (Projects and Installations technicians, Riggers and Gangs). · Worked with technical support engineers on solving problems of Multi access radios system, IRT 2000 in Kwekwe. · Assisting in the preparation of annual budget · Evaluation of new technologies for use in the external plant. · Computerized planning activities to facilitate network planning using application software such as TPE, PATH LOSS for optimum network design, frequency planning and comprehensive Link Budget. · Was part of a team evaluating the possible effects of the millennium bug on external plant equipment and providing possible solutions in liaison with the manufacturers. · Planning of access cable networks. |
|
|
Summary Of Wireless Systems Worked On · IRT 2000 with DECT Tail · SRT500 System with Tangara as the Access Network · Digital Point-to-Point Radio Systems i.e. DXR200, 4 Channel Radio Systems from NEC MDS and Nokia. · Worked on the respective multiplex equipment for the above radios and well versed with integration of equipment from various Manufacturers. |
| 1 month - Discovery | 350 euros | convert |
| 3 months - Bronze | 850 euros | convert |
| 6 months - Silver | 1450 euros | convert |
| 12 months - Gold | 2500 euros | convert |