
|
Academic Degree: |
M.S. Degree in Telecommunication Engineering, Politecnico di Torino, 2000 |
|
Languages: |
Italian (mother tongue), English (fluent), French (fair) |
|
Profile: |
Telecommunication Engineer with consolidated experience in Satellite Navigation Systems and Applications. |
|
Career Summary |
|
|
Currently |
Head of the Performance Unit in the Enginering Dept. of the Navigation & Integrated Comms B.U. in Thales Alenia Space Italia S.p.A. |
|
Currently |
Member of the |
|
May 2000 |
Joined the Alenia Spazio S.p.A. as System Engineer |
|
BACKGROUND EXPERIENCE: |
|
|
(A) Technical and Managerial |
|
|
Dec. 2005 - Currently |
Galileo Phase C/D/E1 ESA Program: Technical responsible and Cost Account Manager, in this frame, of the following line of activities: Ø SI&V Engineering (with ~10 ppl full time) |
|
Dec. 2004 - Currently |
Galileo Phase C/D/E1 ESA Program: Thales Alenia Space Italia is in charge, within the C/D/E1 contract, of the System Integration & Verification (SI&V) activities. Technical responsible and Cost Account Manager, in this frame, of the following line of activities: Ø IOV Test Campaign (with ~6 ppl full time) |
|
July 2005 – Feb. 2006 |
Regione Lazio Program with 9 Subcontractors. Responsible of: Ø System Requirements Definition Ø Orbitography Laboratory Requirements Definition |
|
May 2005 – June 2005 |
Proposal Technical Manager: Responsible for the overall Technical aspects and coordination for the GALCOM (GALileo integrated COMmunications) Project towards European Commission (6th Framework Program) |
|
Nov 2003 –Sep 2004 |
Galileo Phase C0 ESA Study: Ø Member of System Verification Team supporting the activities of Galileo In Orbit Validation (IOV) Test Campaign Definition and Pass/Fail Criteria Identification for Galileo System Verification and Acceptance Ø Responsible of the Work Package defining the Technical Implementation of the Timing Interface between Galileo and GPS Systems for Time Scales Offset Determination (GGTO) |
|
Jan 2003 – Nov 2003 |
Galileo System Test Bed (GSTB V1) Ø System Engineering Responsible for Clock Model Performance Assessment Test Case Experimentation in GSTB V1 Ø System Engineering Responsible for software development of Analysis Tools for time synchronization facility dimensioning and performance assessment |
|
July 2002 – Jan 2003 |
Galileo System Test Bed (GSTB V1) Ø Overall GSTB V1 System Specification responsible Ø Responsible for the Work Package relative to the Technical Coordination of GSTB V1 with Galileo main program |
|
Jan 2002 – July 2002 |
Galileo Phase B2 ESA Study: Ø System Design Manager for Galileo Precise Timing Station (PTS) design and requirements identification c/o Galileo Industries |
|
June 2001 – Jan 2002 |
Galileo Phase B2 ESA Study: Ø Support to the Galileo Architecture Definition, with reference to Time Synchronization Design and Trade-off activities Ø Responsible of the Work Package designing the Two-Way Clock Comparison capability as part of the TT&C transponder functionality c/o Galileo Industries |
|
May 2000 – June 2001 |
GalileoSat System Test Bed (GSTB) Ø System Engineer in GalileoSat System Test Bed (GSTB) Project Ø Responsible of the |
|
(B) Education Summary |
|
|
2000 |
M.S. Degree in Telecommunication Engineering, Politecnico di Torino Degree Thesis carried out at Istituto Elettrotecnico Nazionale “Galileo Ferraris” (IEN) on “Errors of Atomic Frequency Standards on-board Modern Navigation Satellite Systems”. |
|
(C) Technologies |
|
|
Operating Systems: |
q Windows 95/98/ME/2000/NT/XP/2003 |
|
Software Standards: |
q ESA – ECSS Software Engineering Standards q Galileo Software Standards |
|
Programming Languages: |
q Matlab |
|
Software Applications: |
Microsoft Office, Microsoft Visio, Telelogic DOORS-TREK, Matlab, Satellite Toolkit Pro |
|
(D) Courses and Seminars |
|
|
Held |
|
|
May 2007 |
“Time for Navigation and Synchronization Systems” Course in the frame of the Thales Alenia Space Italia – Ø A Walk through Time Ø International Time References Ø Time transfer techniques: an overview Ø Time Traceability Ø Time Synchronization for Navigation Ø Time & Frequency analysis techniques Ø Timing technology & equipments |
|
Dec 2006 |
“Space System Engineering” Course in the frame of the Alcatel Alenia Space Italia – Ø Space Ø Space System Engineering Ø Segments Engineering Ø System Integration & Verification |
|
June 2006 |
“Advanced Communication & Navigation Satellite Systems”, MASTER of “Tor Vergata” Ø Introduction to Satellite Navigation Ø Overall GNSS Systems Architecture Ø Performance Aspects of GNSS Ø Space Based Aspects of GNSS Ø User Terminal Aspects of GNSS Ø The |
|
November 2005 |
“Satellites and Orbiting Platform”, MASTER of “ Ø Introduction to Satellite Navigation Ø Overall GNSS Systems Architecture Ø Performance Aspects of GNSS Ø Space Based Aspects of GNSS Ø User Terminal Aspects of GNSS Ø The |
|
April-May 2005 |
Held the Alenia Spazio CREST course in the Roma and Ø Theory of Satellite Navigation Ø The existing Satellite Navigation Systems Ø The Augmentation Systems Ø The Galileo System Ø The GSTB-V2 Experimental Satellite |
|
Participation |
|
|
July 2005 |
Course on “Satellite Navigation with special emphasis on Galileo”, lecturer Prof. Guenter W. Hein, |
|
Oct 2003 – Apr 2004 |
Alenia Spazio Course on Program Management with the following arguments: Ø Overview on the Project Management Process Ø Sourcing and Subcontractors Management Ø Contractual and Legal Aspects of Subcos Management Ø Risk Management Ø Proposal Preparation Process |
|
(E) Fellowship and Awards |
|
|
September 2006 |
Alcatel Alenia Space Innovation Award 2006 Winner with project “SynchroNet: A Multi-Purpose Network Synchronization System” |
| 1 month - Discovery | 400 euros | convert |
| 3 months - Bronze | 1050 euros | convert |
| 6 months - Silver | 1800 euros | convert |
| 12 months - Gold | 2950 euros | convert |