
Objective
Pursue a career in the area of R&D, getting chance to pursue higher education, design and development of Digital Systems and to excel in this field through sincere and consistent effort with an approach to learn and continuously upgrade myself in order to meet the targets in the specified time.
Employment History
| Organization | Duration | Designation |
| Space Applications Centre (SAC), ISRO, Ahmedabad | Sep’07 To Till date | Sci/Eng ‘SC’ |
| Vikram Sarabhai space Centre (VSSC), ISRO, Trivandrum | Nov.’06 To Sep’07 | Sci/Eng ‘SC’ |
Operating System : MS DOS, Windows98, Windows 2000, XP
Programming/Assembly Languages : C, VB6, VHDL, 8085, 8951.
S/W Development Tools : Xilinx.
Design Packages : AWR VSS, MATLAB, ORCAD.
Measurement Instruments : Vector signal generator (Agilent), Performance Spectrum Analyzer, Pulse/Pattern generator(R&S), SATRE Modem.
Other Skills
Good skills in digital hardware designing.
Good skills in developing Software core.
Strong analytical and problem solving skills.
Good communication and written skill.
Highly self-motivated and hardworking.
Academic Performance
| Examination Passed | Institution/University | Percentage |
| B.Tech (Electronics &
Communication Engineering |
J.K institute of Applied Physics & Technology, University of Allahabad, Allahabad | 80.3 |
| BSC(Electronics, Physics,Maths) | Gorakhpur University,Gorakhpur | 78.2 |
| XII | A.D Girls Inter College, Gorakhpur | 79.0 |
| X | B.P Girls Inter College, Gorakhpur | 74.7 |
Project : Implementation of VHDL Based Centralized PCM Encoder.
Team Size : 5
Duration : Jan’07 to March’07
Responsibilities : In Rohini Sounding Rocket there was distributed PCM Encoder, which was taking input as analog & digital data. There was needed to make it centralized, so that a lot of wires connections can be removed. Therefore we made it centralized and added provision for GPS data also. My responsibilities were to make provision for GPS data.
Project : Development of RAST (RDB Automated Search Tool).
The tool is successfully used for verification of Data files w.r.t RDB (Real Time Database). The front-end used for the tool was Visual Basic 6 and Backend was MS Access.
Team Size : Individual
Duration : April’07 to May’07
Project : IRNSS (Indian Regional Navigation Satellite System) Payload System Engineering.
Team Size : 4
Duration : Oct’07 to till date
Responsibilities : Major responsibilities are as follows:
Others :Verification of data files w.r.t RDB (Real time Database) for PSLV-C8, GSLV F04 & PSLV-C10.
Code Inspection of Different consoles of PSLV-C8, GSLV F04 & PSLV-C10 for different consoles.
Absolute Delay measurement of the complete payload subsystems for L-band and C-band using SATRE Modem
Project : Hardware implementation of FSK MODEM.
Duration : May’06 to Jun’06
Responsibilities : Design of FSK Modulator to modulate digital data & design of FSK Demodulator to retrieve original data.
Awards/Distinction
Topper in all the academic session throughout all the session of study.
Achieve National Scholarship, Jawaharlal Trust Scholarship.
Participated in many extra curricular activities in college and hostel & achieved many prizes.
Organized events at College level.
| Gender | Female |
| Date of Birth | 25th November 1983. |
| Marital Status | Single |
| Langauges Known | English, Hindi |
References:
Scientist /Engineer Scientist/Engineer
Advanced Payload Development Advanced Payload Division Development Division
Space Application Centre, ISRO, Space Application Centre, ISRO
Ahmedabad. Ahmedabad.
| 1 month - Discovery | 400 euros | convert |
| 3 months - Bronze | 1050 euros | convert |
| 6 months - Silver | 1800 euros | convert |
| 12 months - Gold | 2950 euros | convert |