
|
SYSTEM ENGINEER |
|
PROFESSIONNAL EXPERIENCE |
|||
|
Since Feb. 2005 |
System Engineer
|
||
|
|
|
|
|
|
|
|
||
|
|
|
||
|
Since April 2006 |
LAUNCH VEHICLE SYSTEM ENGINEER |
||
|
|
¨ In the frame of Baïkonur Launches, coordinate team and writing associated documentation for : Ä ensuring the consistency and technical synthesis for the Launch Vehicle § definition files § external technical documentation (customer, insurance, user’s manual) Ä the procurement of 3 stages launcher (Soyuz) and the upper stage (Fregat) § Definition, production & control logic, justification files § Pre-shipment review Ä maintaining the launch Vehicle qualification with the Russian manufacturers § requirement or modification definition § impact analysis § validation logic § justification § testing |
||
|
|
|
||
|
|
¨ In the frame of the « Soyuz in Kuru » project : Ä participation to the Launch Vehicle adaptation to Kuru Launch Base (Radio neutralisation, localization and telemetry Systems) Ä participation to the Flight Safety Analysis (launch vehicle overall logic, control system design & reliability) |
||
|
|
|
||
|
Since April 2006 |
LAUNCH VEHICLE TECHNICAL AUTHORITY |
||
|
|
¨ Interface with Russian entities for launch vehicle integration & validation operations ¨ Interface with Russian entities during launch preparation on the Launch Pad ¨ Interface with Russian launch authorities during the launch sequence and the flight (in Command Bunker) ¨ Interface with Russian entities for launch vehicle anomaly processing ¨ Flight data processing (postflight review) |
||
|
|
¨ Launch Campaigns : Ä METOP-A : 1st Soyuz 2-1-A in Baïkonour, 1st flight of the 4.11m fairing Ä COROT : 1st Soyuz 2-1-B (new 3rd stage engine) Ä GLOBALSTAR 7 : new upper stage On Board Computer Ä GLOBALSTAR 8 : new design for upper stage pressurization system Ä RADARSAT-2 |
||
|
|
|
||
|
Since February 2005 |
ElectriCAL & radio-élECTRICAL INTERFACES ENGINEER |
||
|
|
¨ EMC mission analysis
Ä Coordination of analysis performed by Russians entities
Ä Customer interface (technical synthesis, Launcher representative during testing) |
||
|
|
¨ Satellite Electrical Interfaces (umbilical lines, radio link, adapter TM and separation lines)
|
||
|
|
Ä Satellite interfaces analysis Ä Design and acceptance of the corresponding adapter including procurement of Russian hardware Ä Assess the compatibility and adapt if necessary the ground and on-board Russian transit lines Ä Specify and manage validation of the electrical interfaces during launch campaign |
||
|
|
|||
| 1 month - Discovery | 400 euros | convert |
| 3 months - Bronze | 950 euros | convert |
| 6 months - Silver | 1650 euros | convert |
| 12 months - Gold | 2750 euros | convert |