Latest Space News
Fri, 22 Feb 2019 22:23:55 +0000
NASA managers have given their approval for SpaceX to proceed with an uncrewed test flight of its Crew Dragon spacecraft on March 2. SpaceNews.com
Fri, 22 Feb 2019 17:22:42 +0000
SpaceShipTwo successfully flew to the edge of space for the second time Feb. 22, carrying three people for the first time as Virgin Galactic moved closer to beginning commercial operations of the suborbital spaceplane. SpaceNews.com
Fri, 22 Feb 2019 12:12:05 +0000
As NASA selects payloads it plans to fly on commercial lunar landers, companies developing those spacecraft are skeptical any landers will be ready to fly this year, as the agency desires. SpaceNews.com
Fri, 22 Feb 2019 03:18:10 +0000
A SpaceX Falcon 9 carrying an Indonesian communications satellite, an Israeli lunar lander and a U.S. Air Force smallsat launched Feb. 21 from Cape Canaveral, Florida. SpaceNews.com
Thu, 21 Feb 2019 23:49:24 +0000
Air Force Chief of Staff Gen. David Goldfein: "There are a thousand decisions that have to be made." SpaceNews.com
Thu, 21 Feb 2019 23:43:36 +0000
The Pentagon would ask Congress to approve “special temporary authorities” for the secretary of defense to transfer resources from other services to the Department of the Air Force and the Space Force. SpaceNews.com
Thu, 21 Feb 2019 21:34:19 +0000
EchoStar wishes it ordered its latest satellite, Jupiter-3, sooner than it did, but won’t seek to play catch up by buying another copy of the satellite in order to meet surging demand for broadband connectivity, executives said Feb. 21. SpaceNews.com
Thu, 21 Feb 2019 21:10:24 +0000
At the end of 2018, division chief Clare Grason and her entire satellite communications team at the Defense Information Systems Agency moved over to work in the same capacity under Gen. John (“Jay”) Raymond at the Air Force Space Command (AFSPC). SpaceNews.com
Thu, 21 Feb 2019 18:48:59 +0000
The challenge facing U.S. Strategic Command is figuring out how to develop a modern nuclear command, control and communications system (NC3) that passes muster. SpaceNews.com
Wed, 20 Feb 2019 22:17:54 +0000
As Blue Origin prepares to start flying people on its New Shepard suborbital vehicle, the company’s founder says the altitude the vehicle can reach will put it at an advantage over Virgin Galactic’s SpaceShipTwo. SpaceNews.com
Wed, 20 Feb 2019 21:53:23 +0000
The Indonesian communications satellite that is SpaceX’s primary payload for its second Falcon 9 launch this year overcame a change of manufacturers and the loss of a U.S. Ex-Im Bank loan to reach the launch pad. SpaceNews.com
Wed, 20 Feb 2019 17:21:12 +0000
Facebook and Viasat are collaborating first in Mexico, but are open to expanding globally, Viasat said. SpaceNews.com
Wed, 20 Feb 2019 15:26:15 +0000
Virgin Galactic scrubbed the Feb. 20 flight test for SpaceShipTwo, the air-launched suborbital spaceplane, due to high winds in Mojave, California. The flight test is now scheduled for Friday, Feb. 22. SpaceNews.com
Tue, 19 Feb 2019 23:39:24 +0000
The new chair of the House space subcommittee says she’s looking forward to working with the commercial space industry on a number of issues, including oversight of non-traditional space activities. SpaceNews.com
Tue, 19 Feb 2019 23:20:06 +0000
ULA and SpaceX will split six national security launches planned for 2021 to 2022, the Air Force announced Feb. 19. SpaceNews.com
Tue, 19 Feb 2019 22:18:37 +0000
SPD-4 gives the Pentagon the official go-ahead to send a proposal to the White House recommending the establishment of a separate military branch for space. SpaceNews.com
Tue, 19 Feb 2019 20:15:12 +0000
Virgin Galactic plans to conduct a fifth test flight Feb. 20 of its suborbital spaceplane SpaceShipTwo, VSS Unity. SpaceNews.com
Tue, 19 Feb 2019 20:14:26 +0000
A slow start for Eutelsat’s Konnect Africa broadband venture and losses in activities beyond the fleet operator’s core business contributed to a 4.4 percent decline in revenue during the last half of 2018. SpaceNews.com
Mon, 18 Feb 2019 22:11:51 +0000
The multiyear investment begins with 18-month contract worth few million pounds. SpaceNews.com
Mon, 18 Feb 2019 01:28:19 +0000
As LeoStella inaugurated the factory that will be used to produce a series of Earth imaging satellites, the joint venture of Thales Alenia Space and Spaceflight Industries continues to look for other customers. SpaceNews.com
More space news...
19082 cvs - 1003 jobs

LOOKING FOR A JOB?

  • HOME
  • POST YOUR CV
  • JOB SEARCH
  • LOOKING FOR STAFF?

  • HOME
  • REGISTER
  • CV SEARCH
  • POST JOBS
  • CV: Project Manager

    Printer Friendly

     


    << BACK

    Personal information
     Name:<withheld>
     Age:<withheld>
     Country:<withheld>
     Location:<withheld>
    Contact information
     Email:<withheld>
     Phone:<withheld>
     Mobile:<withheld>
    Candidate Profile
     Date Submitted:24-11-2013
     Last Modified:01-12-2013 (06:52)
    Job information
     Current job:Project Manager
     Employment Term:Permanent
     Job location:Anywhere
     Date available:within 2 months
     Industry:Civil Agencies/International Organizations, Satellite Manufacturers and Subcontractors, Satellite Operators, Launch Systems, Business Services, Consulting/Engineering Services
     KeywordsOver 10 years’ experience in the design, manufacture and test of radiofrequency and power conversion equipment for communication satellite payloads, ranging L to Ka band.
    CV

    Summary

     

    Over 10 years’ experience in the design, manufacture and test of radiofrequency and power conversion equipment for communication satellite payloads, ranging L to Ka band.

    The common denominator of all programs where I have participated as technical or program manager is the high content of new development designs and processes. As such, I have dealt with high risk program plans from the technical and programmatic points of view. Wide experience in risk management, problem solving and non-conformance processes.

    Along my career, I have progressed from support electrical engineer tasks to technical manager positions, and later on I shifted to project manager responsibilities.

     

    Experience

     

    Project Manager -- November 2009 – Present

     

    As a technically oriented Project Manager of several new development programs for space applications, my main responsibilities are leading the team all along program execution, to meet all target requirements (performance, quality, cost and schedule). My role also includes customer and subcontractor interface and negotiation.

     

    ·        2010-2013 Development program of Ku and Ka LNAs and Downconverters (4 equipment)

    ·        2012-2013 Development program of 40W DC/DC converter.

    ·        2012-2013 Development program of highly stable and low phase noise X-band DRO.

    ·        2009-2010 X-Band and Ku-Band passive RF equipment. New developments.

     

    I am also regularly involved in the preparation of proposals for new contract opportunities.

     

    Technical Manager -- June 2004 – December 2012

     

    Technical Manager of several programs for space applications. I was in charge of all technical aspects of the equipment from design, manufacturing and test, as well as assessing technical, cost and schedule risks and trade-offs along the program. Owner of all technical related problems and accountable for its analysis and resolution. Design and test engineering team leader as well as customer and subcontractor technical interface.

     

    ·        2009-2012 Technical manager for the development of family of DC/DC converters ranging 1W to 40W for 28V up to 100V spacecraft buses.

    ·        2005-2009 Technical manager for commercial communication satellites with more than 900 L band flight LNAs delivered.

    ·        2004-2005 Technical manager for earth observation program SMOS phase C/D L band radiometer.

     


    Electrical Engineer -- December 2002 – June 2004

     

    Electrical engineer in the Space and Microwave business unit of Mier Comunicaciones. Devoted to the development of a L-band (1.5GHz) radiometer in the frame of the SMOS (Soil Moisture and Ocean Salinity) project of the European Space Agency. Such equipment includes several RF microelectronic circuits self-designed in GaAs (MIXER, LNA, RF and IF amplifiers, ADC and a multiplexer), as well as other modules with discrete components (variable attenuator, power detector, supply and signal filters, matching networks, among others). In this position, most of my activities were focused in the flight production of custom designed MMICs (Monolithic Microwave Integrated Circuit) and corresponding MHICs (Microwave Hybrid Integrated Circuit). I spent several periods at foundry and packaging subcontractor premises dealing with technical and test issues.

     

    RF engineer trainee -- September 2001 – December 2002

     

    Worked part-time in the broadcasting R+D department of Mier Comunicaciones as RF engineer trainee. Focused on analogue TV broadcasting, DVB (Digital Video Broadcasting), DAB (Digital Audio Broadcasting) and GSM base stations. During that period I was involved in the design, prototyping and test of several circuits: frequency synthesizer in the UHF band (500-900MHz) for DVB, PLL’s, radiofrequency amplifiers (0-1.5GHz), analogue filters, frequency doublers, power dividers and others.

     

    Education

     

    M. Sc. degree inElectrical and Electronic Engineering, 2013, UPC (Universitat Politècnica de Catalunya). Master Thesis devoted to the design, analysis, production and test of a family of DC/DC converters for spacecraft bus applications ranging 1W to 40W for 28V to 100V buses.

    M. Sc. degree inCommunications Engineering, 2002, UPC (Universitat Politècnica de Catalunya), obtaining Honour qualification in the Master Thesis. Master Thesis devoted to design and implementation of a 12-bit current steering D/A converter on a 0.35µm CMOS technology for communication applications.

     

    Additional  courses

     

    Specialized courses:

    ·        “Space Systems Engineering” course at University of Southampton.

    ·        Course“Design of CMOS Integrated Circuits for RF Wireless Communications” at Universitat Politècnica de Catalunya.

    ·        Course “Analogue microelectronic design with CMOS and BiCMOS (II): Applications” at Universitat Politècnica de Catalunya.

    ·        Seminars “CAD tools for microelectronic design (I)” and “CAD tools for microelectronic design (II)” at Universitat Politècnica de Catalunya.

    ·        Several seminars devoted to project management, team leading as well as negotiation techniques.

     

    CAD programs:

    ·        Matlab: Powerful software tool for the development, analysis and representation of mathematical models, as well as system simulation (Simulink).

    ·        Spice, Orcad: Circuit spice simulation and layout designer tool for PCB designers.

    ·        Cadence. Electronic design program capable of many applications, especially oriented to digital and analogue microelectronic design.

    ·        Advanced Design System (ADS): Electronic design software designed for communication systems and radiofrequency/microwave active and passive circuits.

    ·        Touchstone, Max_Plus II (AHDL), Leonardo (VHDL synthesis), Magic (layout editor), AutoCAD and others.

     


    Others:

    ·        Course in Robotics (1996). With the design and implementation of a white line follower (“sniffer”).

    ·        Participation in the Spanish Contest of Robots with three self-designed robots, assembled in October of 1998 and 1999 in Barcelona, and in April 2001 in Alcalá de Henares (Madrid) in which my team ranked first.

     

    Scientific Papers

     

    In the frame of my Masther Thesis in Communications Engineering I designed and implemented a 12-bit current steering D/A converter on a 0.35mm CMOS technology capable of working at sampling frequencies of 400MHz (state of the art at that moment). I developed models and results that allowed the preparation and publication of the following scientific papers:

    -  'Extended Mismatch and Dynamic Modelling of Current Sources in Current-Steering CMOS D/A Converters: An Improved Design Procedure' in Transactions on Circuits and Systems, January 2004, vol. 51, pp. 159-169.

    - 'Improved current-source sizing for high-speed high-accuracy current steering D/A converters', accepted and presented at the “IEEE International Conference on Circuits and Systems (ISCAS) 2003”, Bangkok.

    - 'Improved Current Source Cell Sizing Methodology in High-Speed High-Accuracy Current Steering DA Converters', accepted and presented at the “Design of Integrated Circuits and Systems 2002 Congress (DCIS 2002)”, Santander, Spain.

    -  'Improved Design Methodology for High-Speed High-Accuracy Current Steering D/A Converters', accepted and presented at “Design Automation and Test in Europe (DATE) 2003” congress,  Munich, Germany.

    -  The results of my Master Thesis have been used for writing the chapter 'Current-Steering High-Speed D/A Converters for Communications' that appears in the book ‘CMOS Telecom Data Converters’, 2003, p. 93-148. Edited by Mixed Signal Design Cluster and published by Kluwer.

     

    The work performed in the frame of the SMOS mission radiometer lead to the following ESA (European Space Agency) publication:

    -  ‘L-Band Interferometric Radiometer for SMOS Mission‘ published in “ESA Advanced RF Sensors and Remote Instruments” in November 2009.

     

    Languages

     

    Spanish and Catalan: Native speaker.

    English spoken and written: “Certificate of Proficiency in English” (1995), University of Cambridge, England.

     

    Others

     

    President of the Telecogresca association (1998-2011): Gratuitous help towards the Telecogresca association as president and maximum responsible of its activities. This association is responsible, among several other activities, of one of the largest university music festivals in Catalonia.

    I occasionally practice some sports like cycling, squash or running, and also enjoy travelling, cinema, electronics and computers.

    I have no inconvenient in travelling and B1 driving license.


    Registering is the only way of posting vacancies and obtaining contact details of candidates in our CV database.

    All it takes is a few minutes and a credit card (Visa or American Express). To sign-up to this service, simply click on the Register link and fill in the form. You will then have instant access to our system after on-line payment where you will be able to complete the transaction in either US Dollars, UK Pounds or Euros.

    All online credit/debit card transitions are handled through our secure third party payment processors at WorldPay. Worldpay are part of The Royal Bank of Scotland Group, the 5th biggest banking group in the world, WorldPay payment solutions are trusted by thousands of businesses, big and small worldwide. 

    Pricing starts at €450 (approx £400 or US$500 - use the convert tool for an exact conversion) for one month unlimited job postings and unlimited CV database access (for one user), with package discounts available if you have more permanent recruiting needs. For example, a Gold subscription will give you unlimited jobs posting and unlimited CV database access for one year at just over €250 per month!

     

    2019 Pricing Structure (excluding VAT):

    1 month - Discovery 450 euros convert
    3 months - Bronze 1150 euros convert
    6 months - Silver 1950 euros convert
    12 months - Gold 3200 euros convert

     

    If online payment is not convenient, give us a call at +33(0)622757477 or send us an email at sales@space-careers.com. We will set up an account for you and invoice you. Note that you can also pay through PayPal.

     

    Subscriptions

     

    Please note that the posting of academic positions is free of charge. All you need to do is email us your job description and we will post it for you.

     

    VAT:

    Spacelinks is based in France so the following European Union regulations regarding electronic commerce apply:
    - if your business is located outside the EU, VAT does not apply to you
    - if your business is located in France, you will be charged a 20% VAT
    - if your business is located in the EU and you don't have a valid VAT registration number, you will be charged a 20% VAT
    - if your business is located in the EU and you do have a valid VAT registration number, you won't be charged VAT provided you give us your VAT number (mandatory for invoicing)

     

    Support:

    For sales enquiries and general information, you can call us on +33(0)622757477.
    Support is available Mon-Fri on +33(0)622757477 or via email. Out-of-hours support is provided only via email.

    Please also note that we are located in France. Our normal office hours are 09:00 to 18:00 Monday to Friday. France timezone is GMT+1.

     

    Warning:

    We are very serious about our job seekers privacy so only legitimate recruiters and employers are eligible for a recruiter account. All subscriptions requests will be manually approved and recruiter accounts constantly monitored. Users who enter inaccurate or incomplete information will not gain access to post jobs or search resumes. Sharing of login details with a third party will result in the suspension of the recruiter's account with no subscription refund.
    Recruitment agencies are only eligible for a Gold package and recruitment agencies recruiting for companies already using Space Careers will not be accepted.

    To ensure you are approved, please include the following on your application:
    * The website address of your Company. Under construction websites will be rejected.
    * Email - Must end in @yourcompany.com. Applications using free email accounts such as Hotmail, Yahoo or Gmail will be rejected.

    Individual exceptions can be made on a case by case basis by emailing sales@space-careers.com. Accounts found not to be in compliance will be deleted.

     
    Terms & ConditionsCopyright ©2019 Spacelinks
    Web Analytics