Latest Space News
Sat, 15 Jun 2019 19:39:13 +0000
A NASA mission to a metallic asteroid has passed a major review, but questions remain about its ability to remain on budget and schedule. SpaceNews.com
Fri, 14 Jun 2019 20:16:00 +0000
The chairman of the Federal Communications Commission defended the use of spectrum for 5G wireless services while a key senator called for a hearing on potential interference such services could have with space-based weather observations. SpaceNews.com
Fri, 14 Jun 2019 16:53:19 +0000
NASA has laid out a rough plan for what it now calls the Artemis program, including what needs to be built — SLS and Orion, a “minimal” Gateway and lunar landers — and how it can come together in time for a 2024 landing. What the agency has been less forthcoming about, though, is how much it will cost. SpaceNews.com
Fri, 14 Jun 2019 11:24:06 +0000
As astrophysicists prepare to begin their next decadal survey, other scientists and members of Congress endorsed the overall process even as they suggested some changes. SpaceNews.com
Fri, 14 Jun 2019 10:24:16 +0000
NASA Administrator Jim Bridenstine said in a television interview June 13 that it will cost the agency an additional $20 billion to $30 billion to return humans to the moon, the first range of costs given by the agency for the program. SpaceNews.com
Thu, 13 Jun 2019 23:19:45 +0000
The amended language retained two key provisions that help SpaceX and Blue Origin, and removed two others that were opposed by ULA. SpaceNews.com
Thu, 13 Jun 2019 14:56:45 +0000
Small launch vehicle Vector has hired a new chief financial officer who previously held similar positions at Blue Origin and Sierra Nevada Corporation. SpaceNews.com
Thu, 13 Jun 2019 12:33:33 +0000
Six experiments have been granted a place aboard to the future Chinese Space Station through a joint international cooperation initiative, with three more receiving conditional acceptance. SpaceNews.com
Thu, 13 Jun 2019 08:11:32 +0000
HASC creates a United States Space Corps led by a four-star commandant. SpaceNews.com
Wed, 12 Jun 2019 22:52:44 +0000
The SASC is trying to hold the Air Force more accountable for the performance of space acquisition programs. SpaceNews.com
Wed, 12 Jun 2019 21:15:00 +0000
NASA plans to adjust operations of an airborne astronomical observatory in order to increase its scientific productivity. SpaceNews.com
Wed, 12 Jun 2019 20:49:25 +0000
The contract was awarded to SAIC on Jan. 31. Peraton filed a protest March 5. SpaceNews.com
Wed, 12 Jun 2019 17:58:27 +0000
Red Eléctrica said the credit line, formalized June 12, is available for five years with the possibility of extension to seven years. SpaceNews.com
Wed, 12 Jun 2019 17:10:14 +0000
Intelsat General launched FlexAir, a new managed service offering that provides high, performing, resilient broadband service for en-route communications for government officials, troops and cargo aircraft as well as intelligence, surveillance and reconnaissance missions. SpaceNews.com
Wed, 12 Jun 2019 15:22:29 +0000
A SpaceX Falcon 9 successfully launched a trio of Canadian synthetic aperture radar (SAR) satellites June 12 that promise higher resolution imagery with shorter revisit times. SpaceNews.com
Wed, 12 Jun 2019 11:37:24 +0000
In celebration of the 50th anniversary of the Apollo 11 moon landing, SpaceNews will be publishing in July a definitive guide to 11 must-see movies for space professionals and hardcore enthusiasts alike. To prepare for liftoff, we're asking you to weigh in on your picks for must-see movies for anyone serious about space. SpaceNews.com
Wed, 12 Jun 2019 11:11:10 +0000
Scientists and the chair of a key House committee expressed concern at a June 11 hearing that NASA could raid science programs to pay for its accelerated return to the moon. SpaceNews.com
Wed, 12 Jun 2019 02:14:59 +0000
A bipartisan amendment to strike Smith’s space launch provisions is expected to be offered by Colorado lawmakers Lamborn and Crow. SpaceNews.com
Wed, 12 Jun 2019 01:09:02 +0000
Kennedy says SDA will work with all the services. “Nobody said I have to build it all." SpaceNews.com
Tue, 11 Jun 2019 23:30:02 +0000
Tropical storm and space weather forecasts will improve with the help of observations from radio occultation satellites scheduled for launch June 24 on a SpaceX Falcon Heavy, National Oceanic and Atmospheric Administration officials said June 11. SpaceNews.com
More space news...
19277 cvs - 731 jobs

LOOKING FOR A JOB?

  • HOME
  • POST YOUR CV
  • JOB SEARCH
  • LOOKING FOR STAFF?

  • HOME
  • REGISTER
  • CV SEARCH
  • POST JOBS
  • CV: 3D Modeler

    Printer Friendly

     


    << BACK

    Personal information
     Name:<withheld>
     Age:<withheld>
     Country:<withheld>
     Location:<withheld>
    Contact information
     Email:<withheld>
     Phone:<withheld>
     Mobile:<withheld>
    Candidate Profile
     Date Submitted:01-06-2014
     Last Modified:11-06-2014 (08:40)
    Job information
     Current job:3D Modeler
     Employment Term:Permanent
     Job location:Own country
     Date available:immediately
     Industry:
     KeywordsDrafting, Electronics, 3D Modeling, Drafter, Electronics assembler
    CV


    Clearance: Secret
    —————————————————————————————
    DRAFTER with ELECTRONICS EXPERENCE
    Technical experience in working on the Space Shuttle system, working on the wiring, black boxes, electronic sensors, and assisting Engineers in troubleshooting all electrical/electronic shuttle systems.
    —————————————————————————————
    Core Professional strengths:
    - Reading and understanding schematics - Architectural Drafting Basic/Advance
    - Civil 3D Basic/Advance - AutoCAD 3D
    - AutoCAD Basic/Advance - Autodesk Inventor Parametric Modeling
    - Alibre Professional Design  - AutoCAD 2D
    - Word, Excel, Access, Outlook, and Power point. - Using Oscilloscopes
    - Manufacturing, testing, repairing wiring harnesses  - Installing/replacing strain gages
    - Using Ohmmeters  - Making, repairing, installing connectors 
    - Maintained soldering certification  - Reading understanding manufactures Specifications
    - Inspect, diagnose, maintain and operate test setups  - Pro-E/Creo 2.0

    Experience
    Interiors in Flight, Orlando FL 2013 – 2014
    - 3D Modeler using AutoCAD Inventor, AutoCAD 3D, AutoCAD Drafting Suite.
    Portable Air, Cocoa, Florida
    Drafter 2012 - 2013
    - Freelance work creating specification drawings and maintaining drawings files using Alibre Design Professional.
    United Space Alliance:
    Electronics Technician 1996 - 2010.
    - Refer to schematics and manufacturers' specifications that show connections and provide instructions on how to locate problems
    - Measure, cut, and install frameworks and conduit to support and connect wiring, control panels, and junction boxes, using hand tools
    - Identify required data, data acquisition plans and test parameters, setting up equipment to conform to these specifications
    - Confer with engineering personnel regarding details and implications of test procedures and results
    - Inspect, diagnose, maintain, and operate test setups and equipment to detect malfunctions
    - Collaborate with electrical engineers and other personnel to identify, define, and solve developmental problems
    Lockheed Martin:
    Electronics Technician 1985 – 1986 & 1988 - 1996.
    - Inspect and test wiring installations, assemblies, and circuits for resistance factors and for operation; and record results
    - Read and interpret schematic drawings, diagrams, blueprints, specifications, work orders, and reports in order to determine materials requirements and assembly instructions
    - Identify required data, data acquisition plans and test parameters, setting up equipment to conform to these specifications
    - Inspect, diagnose, maintain, and operate test setups and equipment to detect malfunctions
    Northern Telecom:
    Assembler/Tester 1987 - 1988.
    - Assembled and tested components.
    - Used wave solder to install multiple components on to circuit board.

    United States Coast Guard:
    Electronics Technician Second Class 1976 - 1984.
    - Installed/replace electronic equipment.  - Working and assisting other technicians.
    - Trouble shooting problems to component level. - Assigning work orders to technicians.
    Certifications
    Electrostatic Discharge Familiarization  
    This course is intended to familiarize USA employees, including subcontractors, with ESD and the requirements for entering an ESD controlled area.
    Electrostatic Discharge Awareness  
    This course is for personnel who process Electrostatic sensitive parts, equipment, flight hardware, volatile liquids and volatile gases (i.e. inspect, remove, repair, install, etc.).
    Review of DC electronics  
    This test is a review of the students understanding of dc electronics. Successful completion of this test is one part of the 403 flight hardware electrical certification.
    College Credit Certificate – AutoCAD Foundations
    This certificate program teaches the skills needed to operate the hardware and software involving Computer Aided Drafting (CAD). Some of the topics covered include emphasis on 3D environment, wire frame and solid modeling, and land development drawings utilizing CAD
    Credits earned to this certificate program will transfer into the Associates in Science (A.S.) degree in Drafting and Design Technology.
    College Credit Certificate – Drafting
    This certificate program prepares students for employment as a designer/draftsman. The program is designed to give students a board base of drafting instructions and its application into various design professions. The curriculum uses the latest technological information methodology and standards relating to drafting design and construction.
    Credits earned to this certificate program will transfer into the Associates in Science (A.S.) degree in Drafting and Design Technology.
    Awards
    Team Award Commemoration for Critical Hydrogen Overpressure Test for SLC6. Oct 1986
    Commemoration of the Phase 1 Shuttle – Mir Program for Shuttle Discovery mission STS-91  June 1998
    NASA Group Achievement Award for Shuttle Wiring Inspection and Repair Team. May 2000
    Military Experience:
    United States Coast Guard:
    - Electronics Technician ‘A ‘School Vessel Shore Track
    - AN/SPS-29 Radar system - DC Petty Officer School,
    - Loran “A” School,  - Electronics Technician “C” 7 School
    - ESM AN/WLR-1G Combined Maintenance
    Education:
    Brevard Community College: AutoCAD  Graduated in 2012
    - AutoCAD Fundamentals - Advance AutoCAD  - AutoCAD 3D  - Microcomputer - Civil Drafting
     Drafting Graduated in 2012
    - Architectural Drafting  - Advance Architectural Drafting - Advance Civil 3D
    Other Drafting Courses
    - Parametric Modeling with AutoCAD Inventor, Pro-E/Cero 2.0
    I will continue my education for my A.S. Degree in Drafting and Design Technology at Brevard Community College.

    Registering is the only way of posting vacancies and obtaining contact details of candidates in our CV database.

    All it takes is a few minutes and a credit card (Visa or American Express). To sign-up to this service, simply click on the Register link and fill in the form. You will then have instant access to our system after on-line payment where you will be able to complete the transaction in either US Dollars, UK Pounds or Euros.

    All online credit/debit card transitions are handled through our secure third party payment processors at WorldPay. Worldpay are part of The Royal Bank of Scotland Group, the 5th biggest banking group in the world, WorldPay payment solutions are trusted by thousands of businesses, big and small worldwide. 

    Pricing starts at €450 (approx £400 or US$500 - use the convert tool for an exact conversion) for one month unlimited job postings and unlimited CV database access (for one user), with package discounts available if you have more permanent recruiting needs. For example, a Gold subscription will give you unlimited jobs posting and unlimited CV database access for one year at just over €250 per month!

     

    2019 Pricing Structure (excluding VAT):

    1 month - Discovery 450 euros convert
    3 months - Bronze 1150 euros convert
    6 months - Silver 1950 euros convert
    12 months - Gold 3200 euros convert

     

    If online payment is not convenient, give us a call at +33(0)622757477 or send us an email at sales@space-careers.com. We will set up an account for you and invoice you. Note that you can also pay through PayPal.

     

    Subscriptions

     

    Please note that the posting of academic positions is free of charge. All you need to do is email us your job description and we will post it for you.

     

    VAT:

    Spacelinks is based in France so the following European Union regulations regarding electronic commerce apply:
    - if your business is located outside the EU, VAT does not apply to you
    - if your business is located in France, you will be charged a 20% VAT
    - if your business is located in the EU and you don't have a valid VAT registration number, you will be charged a 20% VAT
    - if your business is located in the EU and you do have a valid VAT registration number, you won't be charged VAT provided you give us your VAT number (mandatory for invoicing)

     

    Support:

    For sales enquiries and general information, you can call us on +33(0)622757477.
    Support is available Mon-Fri on +33(0)622757477 or via email. Out-of-hours support is provided only via email.

    Please also note that we are located in France. Our normal office hours are 09:00 to 18:00 Monday to Friday. France timezone is GMT+1.

     

    Warning:

    We are very serious about our job seekers privacy so only legitimate recruiters and employers are eligible for a recruiter account. All subscriptions requests will be manually approved and recruiter accounts constantly monitored. Users who enter inaccurate or incomplete information will not gain access to post jobs or search resumes. Sharing of login details with a third party will result in the suspension of the recruiter's account with no subscription refund.
    Recruitment agencies are only eligible for a Gold package and recruitment agencies recruiting for companies already using Space Careers will not be accepted.

    To ensure you are approved, please include the following on your application:
    * The website address of your Company. Under construction websites will be rejected.
    * Email - Must end in @yourcompany.com. Applications using free email accounts such as Hotmail, Yahoo or Gmail will be rejected.

    Individual exceptions can be made on a case by case basis by emailing sales@space-careers.com. Accounts found not to be in compliance will be deleted.

     
    Terms & ConditionsCopyright ©2019 Spacelinks
    Web Analytics